Substation · Mecklenburg-Vorpommern, Germany
Umspannwerk Stilow
Umspannwerk Stilow is a 525 kV substation in Mecklenburg-Vorpommern, Germany, connected by 50Hertz Transmission GmbH.
We hold more on this asset.Grid operator, location, planned reinforcement and voltage: available on request.
Request this dataFacts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Mecklenburg-Vorpommern | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Grid operator | 50Hertz Transmission GmbH | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Planned reinforcement | Available on request | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) · Restricted · checked 24 Oct 2026 |
| Voltage | 525 kV (levels 525, 380, 220 kV) | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Coordinates | 54.0946, 13.5840 | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
Know more about this substation, or want an introduction to its grid operator? Ask us.
Also recorded as
2 sources record Umspannwerk Stilow; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.
| Name in the source | Identifier | Source | Matched on |
|---|---|---|---|
| Umspannwerk Stilow | asset:osm:way-1530564245 | OpenStreetMap power infrastructure (Overpass) | — |
| Stilow substation | asset:nep:stilow | Netzentwicklungsplan Strom: point measures (Punktmaßnahmen) | Same name and Land |
Nearby
Within 50 km of this substation: 107 power plants (60 operating, 1,688 MW) and 1 data center, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wusterhusen | Power plant | 29 MW | Operating | 1.4 km |
| Klein Schönwalde | Power plant | 14.4 MW | Planned | 12 km |
| Wolgast | Power plant | 19.5 MW | Operating | 12 km |
| Boreus Rechenzentrum GmbH | Data center | — | — | 43 km |
Grid operator and place
More from 50Hertz Transmission GmbH
- Umspannwerk Altdöbernsubstation
- Umspannwerk Altenfeldsubstation
- Umspannwerk Altentreptow Südsubstation
- Beetzsee/Nord substationsubstation
- Brunsbüttel substationsubstation
- Umspannwerk Eisenachsubstation
- Umspannwerk Eulasubstation
- Umspannwerk Freiberg Nordsubstation
Candidate sites around this substation
2 sites of land near Umspannwerk Stilow have it as nearest substation. Each site page gives its area, its distance to the substation and its site score; owners are on request.
- 50 ha site at Gemarkung Stilow, Flur 1, Flurstück 260.0 km · score 81
- 50 ha site at Gemarkung Stilow, Flur 1, Flurstück 14/30.98 km · score 64
Other substations in Mecklenburg-Vorpommern
- 110 kV substation (OSM way/106703932)
- 110 kV substation (OSM way/106827824)
- 110 kV substation (OSM way/110419473)
- 110 kV substation (OSM way/1213255314)
- 110 kV substation (OSM way/1227110987)
- 110 kV substation (OSM way/1269032045)
- 110 kV substation (OSM way/1288895264)
- 110 kV substation (OSM way/1291998164)
Data on this page
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- © OpenStreetMap contributors. OpenStreetMap data centers, ODbL 1.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.