Substation · Lower Saxony, Germany
Planned substation (search area Nüttermoor)
Planned substation (search area Nüttermoor) is a planned 380 kV substation in Lower Saxony, Germany, connected by TenneT TSO GmbH.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Lower Saxony | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Status | Planned | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Grid operator | TenneT TSO GmbH | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | Phase-shifting transformer (4x) (due 2037-2045, transmission network, NEP measure M833, project P483, added by this plan) | Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026 |
| Planned reinforcement | 380 kV shunt reactor (1x) (due 2037, transmission network, NEP measure M591i7, project P400, added by this plan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
| Voltage | 380 kV | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.
Request researchGrid operator and place
More from TenneT TSO GmbH
- Abzweig Waldeck substationsubstation
- Ahlten substationsubstation
- Alfstedtsubstation
- Audorf Südsubstation
- Bechterdissensubstation
- Umspannwerk Bergrheinfeld/Westsubstation
- Umspannwerk Bergshausen 380kVsubstation
- Bleckenstedt/Süd substationsubstation
Other substations in Lower Saxony
- 110 kV substation (OSM node/924018211)
- 110 kV substation (OSM way/1016436315)
- 110 kV substation (OSM way/1021637039)
- 110 kV substation (OSM way/1023904136)
- 110 kV substation (OSM way/1034844279)
- 110 kV substation (OSM way/1087945281)
- 110 kV substation (OSM way/1098352996)
- 110 kV substation (OSM way/1126924534)
Data on this page
- Netzentwicklungsplan Strom: point measures (Punktmaßnahmen). Netzentwicklungsplan Strom: point measures (Punktmaßnahmen), Restricted.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.