Substation · Lower Saxony, Germany

Öchtel

Öchtel is a 380 kV substation in Lower Saxony, Germany, connected by Amprion GmbH.

We hold more on this asset.Planned reinforcement: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationLower SaxonyOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationLower SaxonyNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Grid operatorAmprion GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Grid operatorAmprion GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementMSCDN (1x) (due 2032, transmission network, NEP measure M412a9, project P412, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates52.3194, 7.2786OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Know more about this substation, or want an introduction to its grid operator? Ask us.

Also recorded as

2 sources record Öchtel; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
Öchtelasset:osm:way-796306640OpenStreetMap power infrastructure (Overpass)—
Öchtel substationasset:nep:ochtelNetzentwicklungsplan Strom: point measures (Punktmaßnahmen)Same name and Land

Nearby

Within 50 km of this substation: 242 power plants (136 operating, 2,722 MW), 110 permit notices, 10 CO2 emitters (5 operating) and 5 data centers, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Windpark AutobahnkreuzPower plant14 MWPlanned1.7 km
HuR-IKW-G5Power plant15 MWOperating5.0 km
Windpark OhnePower plant10.5 MWOperating5.5 km
Kraftwerk Emsland (Lingen)CO2 emitter1,623,104 tCO2e—18 km
Nitrogen natuurvergunning application, Dinkelland (prb-2026-5721)Permit notice——22 km
Nitrogen natuurvergunning draft decision, Dinkelland (prb-2026-10464)Permit notice——23 km
Battery storage omgevingsvergunning application, Oldenzaal (gmb-2025-200168)Permit notice——24 km
Raffinerie als GlockeCO2 emitter1,083,008 tCO2e—27 km
Equinix EnschedeData center——31 km

Grid operator and place

More from Amprion GmbH

Other substations in Lower Saxony

All 653 substations in Lower Saxony, Germany

Data on this page