Substation · Bavaria, Germany

Planned substation (search area Plattling)

Planned substation (search area Plattling) is a planned 380 kV substation in Bavaria, Germany, connected by TenneT TSO GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBavariaNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
StatusPlannedNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Grid operatorTenneT TSO GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcement380 kV shunt reactor (1x) (due 2035, transmission network, NEP measure M591h43, project P400, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kVNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.

Request research

Grid operator and place

More from TenneT TSO GmbH

Other substations in Bavaria

All 747 substations in Bavaria, Germany

Data on this page