Substation · Bavaria, Germany

Planned substation (search area Forchheim)

Planned substation (search area Forchheim) is a planned 380 kV substation in Bavaria, Germany, connected by TenneT TSO GmbH.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBavariaNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
StatusPlannedNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Grid operatorTenneT TSO GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcement380 kV shunt reactor (1x) (due 2037, transmission network, NEP measure M591i18, project P400, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementSynchronous condenser (1x) (due 2037, transmission network, NEP measure M592i4, project P400, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcement380 kV shunt reactor (1x) (due 2037, transmission network, NEP measure M591i19, project P400, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kVNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

Research on this substation and the land around it.Its headroom, connection queue and congestion, who owns the land around it, and an introduction to those owners.