Source · Germany
Amprion: potential grid connection points (Reifegradverfahren)
The 10 Amprion switching stations where a connection is expected to be possible ("Anschluss voraussichtlich realisierbar": at least one free bay and connection capacity), with voltage, town, n-0 or n-1, earliest commissioning year and notes (load only; feed-in at reduced capacity only). Stand April 2026. The map also shows stations without a connection possibility, unnamed; no MW figures (Germany). Rare Context derives facts from Amprion: potential grid connection points (Reifegradverfahren) under Restricted without republishing the data itself.
About this source
| Publisher's page | https://www.amprion.net/Strommarkt/Netzkunden/Netzanschluss/Darstellung-der-potenziellen-Netzanschlussmoeglichkeiten-und-der-Kundenprojekte.html |
| Licence | Restricted |
| Credit | Amprion: potential grid connection points (Reifegradverfahren) |
| Licence terms | No licence or reuse grant on the page, the PDFs or the Impressum (https://www.amprion.net/Impressum.html), so all rights are reserved by default. The page's disclaimer: the maps and document "dienen der unverbindlichen Orientierung und geben eine Indikation", without warranty. Claims are listed. Checked 2026-10-25. |
| Coverage | Germany |
| Access | PDF: the supplementary document (Ergaenzendes-Dokument-zu-potenziellen-Netzanschlussmoeglichkeiten-<MM.YYYY>.pdf) linked from the page, read with pipeline/pdf.mjs |
| Refresh | Quarterly |
Download
Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.
| File | Records | Updated | Last checked |
|---|---|---|---|
| substations.jsonl | 96 | 25 Oct 2026 | 25 Oct 2026 |
Pages built from this source
Substations
We hold more from Amprion: potential grid connection points (Reifegradverfahren).60 facts we may not republish, such as new connections, earliest connection and grid operator: available on request.
Request this dataData on this page
- Amprion: potential grid connection points (Reifegradverfahren). Amprion: potential grid connection points (Reifegradverfahren), Restricted.