Amprion: potential grid connection points (Reifegradverfahren)

The 10 Amprion switching stations where a connection is expected to be possible ("Anschluss voraussichtlich realisierbar": at least one free bay and connection capacity), with voltage, town, n-0 or n-1, earliest commissioning year and notes (load only; feed-in at reduced capacity only). Stand April 2026. The map also shows stations without a connection possibility, unnamed; no MW figures (Germany). Rare Context derives facts from Amprion: potential grid connection points (Reifegradverfahren) under Restricted without republishing the data itself.

About this source

Publisher's pagehttps://www.amprion.net/Strommarkt/Netzkunden/Netzanschluss/Darstellung-der-potenziellen-Netzanschlussmoeglichkeiten-und-der-Kundenprojekte.html
LicenceRestricted
CreditAmprion: potential grid connection points (Reifegradverfahren)
Licence termsNo licence or reuse grant on the page, the PDFs or the Impressum (https://www.amprion.net/Impressum.html), so all rights are reserved by default. The page's disclaimer: the maps and document "dienen der unverbindlichen Orientierung und geben eine Indikation", without warranty. Claims are listed. Checked 2026-10-25.
CoverageGermany
AccessPDF: the supplementary document (Ergaenzendes-Dokument-zu-potenziellen-Netzanschlussmoeglichkeiten-<MM.YYYY>.pdf) linked from the page, read with pipeline/pdf.mjs
RefreshQuarterly

Download

Public claims as JSON Lines, one record per line. Listed claims carry no value. Every source's public claims together, as CSV, are in the open data download.

FileRecordsUpdatedLast checked
substations.jsonl9625 Oct 202625 Oct 2026

Pages built from this source

Substations

We hold more from Amprion: potential grid connection points (Reifegradverfahren).60 facts we may not republish, such as new connections, earliest connection and grid operator: available on request.

Request this data

Data on this page