Substation · Rickenbach, Baden-Württemberg, Germany

Kühmoos substation

Kühmoos substation is a 380 kV substation in Rickenbach, Baden-Württemberg, Germany, connected by TransnetBW GmbH.

We hold more on this substation.New connections, demand headroom, earliest connection and generation headroom: available on request.

Request this data

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationBaden-WürttembergNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
LocationRickenbach (point in boundary)BKG Verwaltungsgebiete 1:250 000 (VG250) · DL-DE-BY-2.0 · checked 25 Oct 2026
Grid operatorTransnetBW GmbHNetzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Demand headroomAvailable on requestTransnetBW Netzanschlusskarte · Restricted · checked 25 Oct 2026
Generation headroomAvailable on requestTransnetBW Netzanschlusskarte · Restricted · checked 25 Oct 2026
New connectionsAvailable on requestTransnetBW Netzanschlusskarte · Restricted · checked 25 Oct 2026
Amprion: potential grid connection points (Reifegradverfahren) · Restricted · checked 25 Oct 2026
Earliest connectionAvailable on requestTransnetBW Netzanschlusskarte · Restricted · checked 25 Oct 2026
Amprion: potential grid connection points (Reifegradverfahren) · Restricted · checked 25 Oct 2026
Planned reinforcementE-STATCOM (due 2037, transmission network, NEP measure M17h5, project P90, added by this plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementMeasure in the grid development plan (due 2036, transmission network, NEP measure M700, project TNG-P428, start grid (approved or under way))Netzentwicklungsplan Strom: digital project library · record · CC BY 4.0 · checked 24 Oct 2026
Planned reinforcementMSCDN (due 2032, transmission network, NEP measure M17g7, project TNG-P90, start grid (approved or under way), confirmed by the previous plan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026
Voltage380 kV (levels 380, 220 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Coordinates47.5960, 7.9578OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

Know more about this substation? Ask us.

Also recorded as

4 sources record Kühmoos substation; this page joins their facts, each with its own source. Links to any of the records lead here. How records are matched.

Name in the sourceIdentifierSourceMatched on
Kühmoos substationasset:nep:kuhmoosNetzentwicklungsplan Strom: digital project library—
Netzknoten Kühmoosasset:osm:way-88916034OpenStreetMap power infrastructure (Overpass)Same name and Land
Kühmoos substationasset:transnetbw:kuehmoosTransnetBW NetzanschlusskarteSame name and Land
Kühmoos substationasset:amprion:kuhmoosAmprion: potential grid connection points (Reifegradverfahren)Same name and Land

Nearby

Within 50 km of this substation: 63 power plants (26 operating, 11,484 MW), measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
WKW SäckingenPower plant69 MWOperating4.3 km
Säckingen power stationPower plant73.6 MW—4.3 km
BESS Wehr – 11,5 MWPower plant11.5 MWPlanned4.4 km

Grid operator and place

More from TransnetBW GmbH

Other substations in Baden-Württemberg

All 539 substations in Baden-Württemberg, Germany

Data on this page