Powered land · Saxony
50 ha site at Gemarkung Kieritzsch, Flurstück 434/8
A candidate site of 49.9 ha in Saxony, made up of 15 cadastral parcels, mostly farmland. It lies 0.88 km from the 110 kV substation BGH Edelstahl Lippendorf GmbH. The nearest transmission substation, Umspannwerk Pulgar (380 kV), is 4.9 km away, where the grid development plan lists 1 measure.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 49.9 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 15 (largest: Gemarkung Kieritzsch, Flurstück 434/8) | ALKIS Sachsen (open cadastre) · Free of charge with the source credited · checked 24 Oct 2026 |
| Land use | Farmland (Landwirtschaft) (96% of the area, as the cadastre records it) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Location | Saxony | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 51.1659, 12.3980 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | BGH Edelstahl Lippendorf GmbH (0.88 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Pulgar (4.9 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Planned at that substation | 380 kV AC switchgear (replacement) (due 2045) (Netzentwicklungsplan) | Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026 |
How it compares
#183 of 264 sites in Saxony and #3,321 of 4,863 in Germany by site score. Larger than 3% of the sites in Saxony. Closer to its substation than 64% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 49.9 ha | 15.7 | 35 |
| Distance to the substation | 0.88 km | 19.6 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 45 | 100 |
How the site score works in Germany · Search sites in Saxony
Nearby sites on the same substation
1 other site has BGH Edelstahl Lippendorf GmbH as nearest substation and would compete for its capacity.
- 75 ha site at Gemarkung Kieritzsch, Flurstück 233/130.4 km · score 62
Parcels in this site
Adjacent parcels that share at least 10 m of boundary, merged up to 50 ha, largest first. Each links to its cadastre record.
- Sites in Saxony272
- Sites in Germany5,000
- BGH Edelstahl Lippendorf GmbHsubstation
Data on this page
- ALKIS Sachsen (open cadastre). ALKIS Sachsen (open cadastre), Free of charge with the source credited.
- Netzentwicklungsplan Strom 2037/2045 (2025), zweiter Entwurf | Übertragungsnetzbetreiber (M) CC-BY-4.0. Netzentwicklungsplan Strom: digital project library, CC BY 4.0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.