Powered land · Saxony-Anhalt

58 ha site at Gemarkung Magdeburg, Flur 714, Flurstück 10083

A candidate site of 57.8 ha in Saxony-Anhalt, made up of 1 cadastral parcel, mostly sport and leisure land. It lies 1.48 km from the 110 kV substation Umspannwerk Magdeburg/Sandtorstraße (Netze Magdeburg). The nearest transmission substation, Umspannwerk Wolmirstedt (380 kV), is 14.7 km away, where the grid development plan lists 2 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area57.8 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Magdeburg, Flur 714, Flurstück 10083)ALKIS Sachsen-Anhalt (open cadastre) · dl-de/by-2-0 for LVermGeo open data · checked 24 Oct 2026
Land useSport and leisure land (Sport-, Freizeit- und Erholungsfläche) (71% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationSaxony-AnhaltRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.1365, 11.6792 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Magdeburg/Sandtorstraße (1.48 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorNetze MagdeburgOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Wolmirstedt (14.7 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380 kV AC switchgear (replacement) (due 2034) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#204 of 256 sites in Saxony-Anhalt and #4,063 of 4,863 in Germany by site score. Larger than 38% of the sites in Saxony-Anhalt. Closer to its substation than 33% of them.

PartThis sitePointsOf
Area57.8 ha18.535
Distance to the substation1.48 km9.135
Substation voltage110 kV1030
Site score38100

How the site score works in Germany · Search sites in Saxony-Anhalt

Data on this page