Powered land · North Rhine-Westphalia

50 ha site at Gemarkung Weisweiler, Flur 2, Flurstück 770

A candidate site of 49.9 ha in North Rhine-Westphalia, made up of 12 cadastral parcels. It lies 0.3 km from the 380 kV substation Umspannanlage Zukunft (Amprion GmbH). That substation belongs to the transmission grid.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area49.9 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels12 (largest: Gemarkung Weisweiler, Flur 2, Flurstück 770)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useForest (Wald) (42% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Binding land-use plan (Bebauungsplan)Industrie- und Gewerbepark IV (25.7% of the site; Eschweiler; since 21 Aug 1996)Räumliche Pläne nach BauGB in Nordrhein-Westfalen (OGC API) · dl-de/by-2-0 · checked 25 Oct 2026
Binding land-use plan (Bebauungsplan)Industrie- und Gewerbepark II (18.2% of the site; Eschweiler; since 1 Jan 1993)Räumliche Pläne nach BauGB in Nordrhein-Westfalen (OGC API) · dl-de/by-2-0 · checked 25 Oct 2026
Binding land-use plan (Bebauungsplan)Industrie- und Gewerbepark III (17.4% of the site; Eschweiler; since 21 Aug 1996)Räumliche Pläne nach BauGB in Nordrhein-Westfalen (OGC API) · dl-de/by-2-0 · checked 25 Oct 2026
Binding land-use plan (Bebauungsplan)Industrie- und Gewerbepark VI (6.6% of the site; Eschweiler; since 7 Apr 2017)Räumliche Pläne nach BauGB in Nordrhein-Westfalen (OGC API) · dl-de/by-2-0 · checked 25 Oct 2026
Binding land-use plan (Bebauungsplan)Industrie- und Gewerbepark I (4.4% of the site; Eschweiler; since 1 Jan 1993)Räumliche Pläne nach BauGB in Nordrhein-Westfalen (OGC API) · dl-de/by-2-0 · checked 25 Oct 2026
Not designatedregional priority area for industry and commerce and designated wind energy area (checked against the published areas)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates50.8370, 6.3009 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannanlage Zukunft (0.3 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage380 kV (levels 380, 110 kV)OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorAmprion GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannanlage Zukunft (0.4 km from the nearest parcel, 380 kV, Amprion GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressHigh (40–80%) (score 3.8 of 5, withdrawals 67.2% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

#27 of 632 sites in North Rhine-Westphalia and #266 of 4,863 in Germany by site score. Larger than 12% of the sites in North Rhine-Westphalia. Closer to its substation than 87% of them.

PartThis sitePointsOf
Area49.9 ha15.735
Distance to the substation0.3 km29.835
Substation voltage380 kV3030
Site score75100

How the site score works in Germany · Search sites in North Rhine-Westphalia

Parcels in this site

Adjacent parcels that share at least 10 m of boundary, merged up to 50 ha, largest first. Each links to its cadastre record.

Data on this page