Powered land · North Rhine-Westphalia

137 ha site at Gemarkung Lippstadt, Flur 23, Flurstück 62

A candidate site of 137 ha in North Rhine-Westphalia, made up of 1 cadastral parcel. It lies 1.41 km from an unnamed 110 kV substation (Stadtwerke Lippstadt GmbH). The nearest transmission substation, Umspannungsanlage Uentrop (380 kV), is 22.9 km away, where the grid development plan lists 2 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area137 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Lippstadt, Flur 23, Flurstück 62)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useSport and leisure land (Sport-, Freizeit- und Erholungsfläche) (40% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates51.6960, 8.3269 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substation110 kV substation (OSM way/252598983) (1.41 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorStadtwerke Lippstadt GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannungsanlage Uentrop (22.9 km from the nearest parcel, 380 kV, Amprion GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substationMSCDN (1x) (due 2032); Short-circuit strength upgrade (due 2037) (Netzentwicklungsplan)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#204 of 632 sites in North Rhine-Westphalia and #1,766 of 4,863 in Germany by site score. Larger than 89% of the sites in North Rhine-Westphalia. Closer to its substation than 31% of them.

PartThis sitePointsOf
Area137 ha3535
Distance to the substation1.41 km10.335
Substation voltage110 kV1030
Site score55100

How the site score works in Germany · Search sites in North Rhine-Westphalia

Data on this page