Powered land · North Rhine-Westphalia

59 ha site at Gemarkung Lahde, Flur 17, Flurstück 102

A candidate site of 59.2 ha in North Rhine-Westphalia, made up of 1 cadastral parcel, mostly industrial and commercial land. It touches the 380 kV substation Umspannwerk Heyden (TenneT TSO GmbH): most such sites are the station's own land. That substation belongs to the transmission grid.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area59.2 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Lahde, Flur 17, Flurstück 102)ALKIS Nordrhein-Westfalen (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026
Land useIndustrial and commercial land (Industrie- und Gewerbefläche) (61% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationNorth Rhine-WestphaliaRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.3838, 8.9983 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationUmspannwerk Heyden (0 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage380 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorTenneT TSO GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Heyden (0.5 km from the nearest parcel, 380 kV, TenneT TSO GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026
Water stressMedium to high (20–40%) (score 2.9 of 5, withdrawals 36% of renewable supply)WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026

How it compares

Ranked apart: it touches its substation, and most sites that do are the station's own land. Its score would be 84.

PartThis sitePointsOf
Area59.2 ha1935
Distance to the substation0 km3535
Substation voltage380 kV3030
Site score84100

How the site score works in Germany · Search sites in North Rhine-Westphalia