Powered land · Mecklenburg-Vorpommern

52 ha site at Gemarkung Petersdorf, Flur 1, Flurstück 174/10

A candidate site of 52.3 ha in Mecklenburg-Vorpommern, made up of 1 cadastral parcel, mostly farmland. It lies 1.68 km from the 110 kV substation Woldegk Nord (E.DIS Netz GmbH). The nearest transmission substation, Umspannwerk Altentreptow Süd (380 kV), is 28.7 km away, where the grid development plan lists 2 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area52.3 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Petersdorf, Flur 1, Flurstück 174/10)ALKIS Mecklenburg-Vorpommern (open cadastre) · Free reuse with credit · checked 24 Oct 2026
Land useFarmland (Landwirtschaft) (98% of the area, as the cadastre records it)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
LocationMecklenburg-VorpommernRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.4789, 13.5359 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationWoldegk Nord (1.68 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorE.DIS Netz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationUmspannwerk Altentreptow Süd (28.7 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substation380 kV shunt reactor (1x 176 Mvar) (due 2027-2030) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

#226 of 247 sites in Mecklenburg-Vorpommern and #4,616 of 4,863 in Germany by site score. Larger than 26% of the sites in Mecklenburg-Vorpommern. Closer to its substation than 21% of them.

PartThis sitePointsOf
Area52.3 ha16.535
Distance to the substation1.68 km5.635
Substation voltage110 kV1030
Site score32100

How the site score works in Germany · Search sites in Mecklenburg-Vorpommern

Nearby sites on the same substation

1 other site has Woldegk Nord as nearest substation and would compete for its capacity.