Powered land · Lower Saxony

206 ha site at Gemarkung Larrelt, Flur 15, Flurstück 2/28

A candidate site of 206 ha in Lower Saxony, made up of 1 cadastral parcel. It touches the 110 kV substation VW/West (Avacon Netz GmbH): most such sites are the station's own land. The nearest transmission substation, Konverter Station Emden Ost (380 kV), is 5.6 km away, where the grid development plan lists 3 measures.

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area206 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Larrelt, Flur 15, Flurstück 2/28)ALKIS Niedersachsen (open cadastre) · CC BY 4.0 for LGLN OpenGeoData since 2024-06-09 · checked 24 Oct 2026
LocationLower SaxonyRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates53.3492, 7.1541 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationVW/West (0 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage110 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorAvacon Netz GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Nearest transmission substationKonverter Station Emden Ost (5.6 km from the nearest parcel, 380 kV, TenneT TSO GmbH)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Planned at that substationSynchronous condenser (1x) (due 2030); Short-circuit strength upgrade (due 2037) (Netzentwicklungsplan; 1 more measure available on request)Netzentwicklungsplan Strom: digital project library · CC BY 4.0 · checked 24 Oct 2026

How it compares

Ranked apart: it touches its substation, and most sites that do are the station's own land. Its score would be 80.

PartThis sitePointsOf
Area206 ha3535
Distance to the substation0 km3535
Substation voltage110 kV1030
Site score80100

How the site score works in Germany · Search sites in Lower Saxony

Data on this page