Powered land · Lower Saxony

90 ha site at Gemarkung Grohnde, Flur 2, Flurstück 5/16

A candidate site of 90.3 ha in Lower Saxony, made up of 1 cadastral parcel. It lies 0.23 km from the 380 kV substation Grohnde (TenneT TSO GmbH).

Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.

Request owner, grid and planning

Facts

Every value links to its source. Licences and last-checked dates are per row.

FactValueSource
Area90.3 ha (the official areas of its parcels added up)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Cadastral parcels1 (largest: Gemarkung Grohnde, Flur 2, Flurstück 5/16)ALKIS Niedersachsen (open cadastre) · CC BY 4.0 for LGLN OpenGeoData since 2024-06-09 · checked 24 Oct 2026
LocationLower SaxonyRare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Coordinates52.0267, 9.4005 (a point on the largest parcel)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Nearest substationGrohnde (0.23 km, site edge to substation fence)Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026
Substation voltage380 kVOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026
Substation operatorTenneT TSO GmbHOpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026

How it compares

#4 of 562 sites in Lower Saxony and #23 of 4,863 in Germany by site score. Larger than 73% of the sites in Lower Saxony. Closer to its substation than 90% of them.

PartThis sitePointsOf
Area90.3 ha29.935
Distance to the substation0.23 km3135
Substation voltage380 kV3030
Site score91100

How the site score works in Germany · Search sites in Lower Saxony

Nearby sites on the same substation

1 other site has Grohnde as nearest substation and would compete for its capacity.

Data on this page