50 ha site at Gemarkung Tegel-Forst, Flur 4, Flurstück 546/7
A candidate site of 49.9 ha in Berlin, made up of 3 cadastral parcels. It lies 0.72 km from the 110 kV substation Umspannwerk Heiligensee (Stromnetz Berlin). The nearest transmission substation, Umspannwerk Teufelsbruch (380 kV), is 3.3 km away.
Owner, grid capacity and planning status on request.We do not publish owners: the German land register (Grundbuch) is not public. Ask us and we find out who owns these parcels, the free capacity at the nearest substation and the zoning that applies, and whether the site is available.
Request owner, grid and planningFacts
Every value links to its source. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Area | 49.9 ha (the official areas of its parcels added up) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Cadastral parcels | 3 (largest: Gemarkung Tegel-Forst, Flur 4, Flurstück 546/7) | ALKIS Berlin (open cadastre) · dl-de/zero-2-0 · checked 24 Oct 2026 |
| Zoning | Nature (Wald; Flächennutzungsplan Berlin, Neubekanntmachung 2025; 96% of the site) | Geodatenportal Berlin: Flächennutzungsplan and Bebauungspläne · dl-de/zero-2-0 · checked 25 Oct 2026 |
| Not designated | binding land-use plan (Bebauungsplan) (checked against the published areas) | Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026 |
| Location | Berlin | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Coordinates | 52.6028, 13.2588 (a point on the largest parcel) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Nearest substation | Umspannwerk Heiligensee (0.72 km, site edge to substation fence) | Rare Context powered-land sites · ODbL 1.0 · checked 24 Oct 2026 |
| Substation voltage | 110 kV | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Substation operator | Stromnetz Berlin | OpenStreetMap power infrastructure (Overpass) · record · ODbL 1.0, © OpenStreetMap contributors · checked 24 Oct 2026 |
| Nearest transmission substation | Umspannwerk Teufelsbruch (3.3 km from the nearest parcel, 380 kV, 50Hertz Transmission GmbH) | Rare Context powered-land sites · ODbL 1.0 · checked 25 Oct 2026 |
| Water stress | High (40–80%) (score 3.8 of 5, withdrawals 71.1% of renewable supply) | WRI Aqueduct 4.0 · CC BY 4.0 · checked 25 Oct 2026 |
How it compares
#28 of 44 sites in Berlin and #2,887 of 4,863 in Germany by site score. Larger than 15% of the sites in Berlin. Closer to its substation than 63% of them.
| Part | This site | Points | Of |
|---|---|---|---|
| Area | 49.9 ha | 15.7 | 35 |
| Distance to the substation | 0.72 km | 22.4 | 35 |
| Substation voltage | 110 kV | 10 | 30 |
| Site score | 48 | 100 |
How the site score works in Germany · Search sites in Berlin
Parcels in this site
Adjacent parcels that share at least 10 m of boundary, merged up to 50 ha, largest first. Each links to its cadastre record.
- Sites in Berlin46
- Sites in Germany5,000
- Umspannwerk Heiligenseesubstation
Data on this page
- ALKIS Berlin (open cadastre). ALKIS Berlin (open cadastre), dl-de/zero-2-0.
- Geodatenportal Berlin: Flächennutzungsplan and Bebauungspläne. Geodatenportal Berlin: Flächennutzungsplan and Bebauungspläne, dl-de/zero-2-0.
- OpenStreetMap power infrastructure (Overpass). OpenStreetMap power infrastructure (Overpass), ODbL 1.0, © OpenStreetMap contributors.
- Rare Context. Rare Context powered-land sites, ODbL 1.0.
- Kuzma, S., M.F.P. Bierkens, S. Lakshman, T. Luo, L. Saccoccia, E. H. Sutanudjaja, and R. Van Beek. 2023. Aqueduct 4.0: Updated Decision-Relevant Global Water Risk Indicators. Technical Note. Washington, DC: World Resources Institute. doi.org/10.46830/writn.23.00061. WRI Aqueduct 4.0, CC BY 4.0.