Nantycaws Waste Management Facility, Llanddarog - Solar Farm

Nantycaws Waste Management Facility, Llanddarog - Solar Farm is a permitted power plant in Carmarthenshire, Wales, United Kingdom, with 2 MW of capacity, operated by CWM Environmental Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationCarmarthenshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNantycaws Waste Management Facility, Llanddarog, Nantycaws, SA32 8BGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date17 Dec 2024 (permit PL/08219, Town and Country Planning Act, issued by Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Sept 2024 (reference PL/08219, planning authority Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date17 Dec 2024 (granted, reference PL/08219, planning authority Carmarthenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCWM Environmental Limited (CWM Environmental Limited (head offfice))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area4.35 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.8364, -4.2099DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Carmarthenshire, reference PL/08219)
  2. Permit applied for (planning authority Carmarthenshire, reference PL/08219)

How it compares

Nantycaws Waste Management Facility, Llanddarog - Solar Farm is the 148th-largest of 177 power plants planned, permitted or under construction in Wales and the 2,806th-largest of 3,222 in the United Kingdom by capacity; its 2 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales148th of 17716,801 MW<0.1%
United Kingdom2,806th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data6,008th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Brechfa Forest ConnectionTransmission line—Permitted14 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page