Power plant · Pembrokeshire, Wales, United Kingdom
Land West of Roberts Wall Far
Land West of Roberts Wall Far is a power plant in Pembrokeshire, Wales, United Kingdom, with 2.5 MW of capacity, operated by Navitas Project.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Pembrokeshire (coordinates), Wales | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Land West of, Roberts Wall Far, Trefloyne Lane, Penally, Tenby, Dyfed, SA70 8NF | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Operating (operational) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Start year | 2016 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 26 Jun 2015 (permit 14/1055/PA, Town and Country Planning Act, issued by Pembrokeshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 17 Feb 2015 (reference 14/1055/PA, planning authority Pembrokeshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 26 Jun 2015 (granted, reference 14/1055/PA, planning authority Pembrokeshire) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Navitas Project | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 2.5 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Solar Photovoltaics | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Area | 4.27 ha (solar site area) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 51.6717, -4.7443 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Land West of Roberts Wall Far is the 349th-largest of 424 power plants in Wales and the 3,943rd-largest of 5,050 in the United Kingdom by capacity; its 2.5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.
| Within | Rank | Total | Share |
|---|---|---|---|
| Wales | 349th of 424 | 9,068 MW | <0.1% |
| United Kingdom | 3,943rd of 5,050 | 115,642 MW | <0.1% |
| All power plants in our data | 9,997th of 12,008 | 1,173,302 MW | <0.1% |
Timeline
Dated facts about this power plant from its sources, oldest first.
- Permit issued (Town and Country Planning Act), no. 14/1055/PA
- Started operating
Nearby
Within 50 km of this power plant: 59 grid connections and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 4, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Roberts Wall Solar Park grid connection | Grid connection | — | — | 0.3 km |
| Dura Park Bynea Yspitty Road LLANELLI grid connection | Grid connection | — | — | 3.1 km |
| Jordanston Farm PV Generation grid connection | Grid connection | — | — | 3.3 km |
| Brechfa Forest Connection | Transmission line | — | Permitted | 49 km |
Operator and place
More from Navitas Project
- Land To The North Of Moor Farm3.8 MW
- SPF Thirty Acres Farm3.8 MW
- Wick Lane Solar Ltd2.8 MW
- Somersal Mill Farm2.6 MW
- Carver Hay, moss lane2.5 MW
- Land on Park Farm2.4 MW
Other power plants in Wales
- Dinorwig1,728 MW
- Gwynt y Mor576 MW
- Ffestiniog360 MW
- Port Talbot Renewable Energy Plant350 MW
- Anglesey Biomass Power Station299 MW
- Tidal Lagoon Swansea Bay240 MW
- Pen Y Cymoedd228 MW
- Carnedd Wen Wind Farm150 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- NGED Connected Data portal. NGED Connected Data portal, Terms not verified.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.