Power plant · Pembrokeshire, Wales, United Kingdom

Jordanston Solar Farm

Jordanston Solar Farm is a power plant in Pembrokeshire, Wales, United Kingdom, with 5 MW of capacity, operated by AEE Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPembrokeshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSt Florence, Tenby, Dyfed, SA70 8NQDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2013DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date26 Sept 2012 (permit 12/0252/PA, Town and Country Planning Act, issued by Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Jun 2012 (reference 12/0252/PA, planning authority Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Sept 2012 (granted, reference 12/0252/PA, planning authority Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorAEE RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6759, -4.7937DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Jordanston Solar Farm is the 231st-largest of 424 power plants in Wales and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Wales231st of 4249,068 MW<0.1%
United Kingdom2,742nd of 5,050115,642 MW<0.1%
All power plants in our data8,356th of 12,0081,173,302 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Permit issued (Town and Country Planning Act), no. 12/0252/PA
  2. Started operating

Nearby

Within 50 km of this power plant: 55 grid connections, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Jordanston Farm PV Generation grid connectionGrid connection——0.3 km
Dura Park Bynea Yspitty Road LLANELLI grid connectionGrid connection——2.3 km
Roberts Wall Solar Park grid connectionGrid connection——3.2 km