Power plant · Pembrokeshire, Wales, United Kingdom

Goldborough Road, Hundleton - Battery Energy Storage

Goldborough Road, Hundleton - Battery Energy Storage is a permitted power plant in Pembrokeshire, Wales, United Kingdom, with 350 MW of capacity, operated by Pembroke Green Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPembrokeshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGoldborough Road, Hundleton, SA71 5SHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date6 Jan 2025 (permit 24/0133/PA, Town and Country Planning Act, issued by Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 May 2024 (reference 24/0133/PA, planning authority Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date6 Jan 2025 (granted, reference 24/0133/PA, planning authority Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPembroke Green Limited (Pembroke Green Limited (Enso Energy and Cero Generation))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity350 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6668, -5.0014DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Goldborough Road, Hundleton - Battery Energy Storage is the 11th-largest of 177 power plants planned, permitted or under construction in Wales and the 198th-largest of 3,222 in the United Kingdom by capacity; its 350 MW is 0.12% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales11th of 17716,801 MW2.1%
United Kingdom198th of 3,222300,661 MW0.12%
All power plants planned, permitted or under construction in our data439th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 42 grid connections, measured from the coordinates in the facts above. The table shows the nearest 3.

NameKindSizeStatusDistance
Little Neath, Wogaston Farm grid connectionGrid connection——0.8 km
Hoplass Solar Farm, Rhoscrowther grid connectionGrid connection——0.9 km
Lambeeth BESS, Land at : grid connectionGrid connection——1.6 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page