Power plant · Pembrokeshire, Wales, United Kingdom

Bluestone National Park Resort, Canaston Wood - Solar Farm

Bluestone National Park Resort, Canaston Wood - Solar Farm is a planned power plant in Pembrokeshire, Wales, United Kingdom, with 4 MW of capacity, operated by Bluestone Resorts Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPembrokeshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressBluestone National Park Resort, Canaston Wood, Narberth, SA67 8DEDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date14 Dec 2022 (reference 22/0804/PA, planning authority Pembrokeshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorBluestone Resorts LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area11 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.7872, -4.7946DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Pembrokeshire, reference 22/0804/PA)

How it compares

Bluestone National Park Resort, Canaston Wood - Solar Farm is the 140th-largest of 177 power plants planned, permitted or under construction in Wales and the 2,616th-largest of 3,222 in the United Kingdom by capacity; its 4 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales140th of 17716,801 MW<0.1%
United Kingdom2,616th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data5,764th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 1 transmission line, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Brechfa Forest ConnectionTransmission line—Permitted45 km

Operator and place

Other power plants in Wales

All 616 power plants in Wales, United Kingdom