Power plant · Pembrokeshire, Wales, United Kingdom

Alleston Solar Farm

Alleston Solar Farm is a permitted power plant in Pembrokeshire, Wales, United Kingdom, with 30 MW of capacity, operated by Stantec UK.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPembrokeshire (coordinates), WalesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAlleston Farm, Lamphey Road, SA71 5NJDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date10 Mar 2026 (permit CAS-03072-D7X6N7, Welsh Government development of national significance, issued by Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date16 Dec 2024 (reference CAS-03072-D7X6N7, planning authority Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date10 Mar 2026 (granted, reference CAS-03072-D7X6N7, planning authority Welsh Government (NSIP))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorStantec UKDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity30 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area100 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.6689, -4.8915DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Welsh Government (NSIP), reference CAS-03072-D7X6N7)
  2. Permit applied for (planning authority Welsh Government (NSIP), reference CAS-03072-D7X6N7)

How it compares

Alleston Solar Farm is the 80th-largest of 177 power plants planned, permitted or under construction in Wales and the 1,569th-largest of 3,222 in the United Kingdom by capacity; its 30 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Wales80th of 17716,801 MW0.18%
United Kingdom1,569th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,981st of 6,455664,040 MW<0.1%

Operator and place

More from Stantec UK

Other power plants in Wales

All 616 power plants in Wales, United Kingdom

Data on this page