Power plant · Highland, Scotland, United Kingdom

West Garty Windfarm

West Garty Windfarm is a cancelled power plant in Highland, Scotland, United Kingdom, with 54 MW of capacity, operated by West Garty Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressWest Garty Estate, Helmsdale, East Sutherland, KW8 6HPDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Dec 2014 (reference EC00002075, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Oct 2018 (refused, reference EC00002075, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Oct 2018 (appeal refused, reference EC00002075, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWest Garty Renewables (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity54 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units18 units (3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.1161, -3.7847DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Scottish Government (S36), reference EC00002075)
  2. Permit refused (appeal refused, planning authority Scottish Government (S36), reference EC00002075)
  3. Permit applied for (planning authority Scottish Government (S36), reference EC00002075)

How it compares

West Garty Windfarm is the 152nd-largest of 1,326 power plants in Scotland and the 367th-largest of 5,723 in the United Kingdom by capacity; its 54 MW is <0.1% of the 136,106 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland152nd of 1,32640,645 MW0.13%
United Kingdom367th of 5,723136,106 MW<0.1%
All power plants in our data1,790th of 12,7051,210,931 MW<0.1%

Nearby

Within 50 km of this power plant: 29 grid connections (15 operating, 293 MW) and 24 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Crakaig Wind Energy Hub grid connectionGrid connection85.2 MWPlanned4.5 km
Helmsdale PrimarySubstation——7.4 km
50MW grid connectionGrid connection52.7 MWPlanned11 km
Brora GSPSubstation——12 km
Brora PrimarySubstation——12 km
Boulfruich Windfarm grid connectionGrid connection14.3 MWOperating28 km