Power plant · Scotland, United Kingdom

Wello Penguin Device (Billia Croo - EMEC) Power Station

Wello Penguin Device (Billia Croo - EMEC) Power Station is a power plant in Scotland, United Kingdom, with 1 MW of capacity, operated by Wello.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressFall of Warness, Off Eday, Orkney IslandsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusOperating (operational)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Start year2008DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 Sept 2007 (Electricity Act 1989 section 36, issued by Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date29 Jun 2007 (planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Sept 2007 (granted, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWelloDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyShoreline WaveDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.7349, -3.3217DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Commissioned
  2. Permit granted (planning authority Scottish Government (S36))
  3. Permit applied for (planning authority Scottish Government (S36))

How it compares

Wello Penguin Device (Billia Croo - EMEC) is the 1,295th-largest of 1,340 power plants in Scotland and the 5,619th-largest of 5,834 in the United Kingdom by capacity; its 1 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland1,295th of 1,34046,467 MW<0.1%
United Kingdom5,619th of 5,834200,500 MW<0.1%
All power plants in our data15,550th of 15,7991,918,113 MW<0.1%

Timeline

Dated facts about this power plant from its sources, oldest first.

  1. Started operating

Nearby

Within 50 km of this power plant: 61 grid connections (30 operating, 303 MW) and 20 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
HOY Wind Farm grid connectionGrid connection66 MWPlanned13 km
Lyness PrimarySubstation——13 km
Orkney Community Wind Farm - HOY grid connectionGrid connection30 MWPlanned13 km
Flotta PrimarySubstation——16 km
Lochend Wind grid connectionGrid connection12.2 MWPlanned16 km
Rackwick PrimarySubstation——16 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page