Power plant · Highland, Scotland, United Kingdom

Upper Smerral Wind Cluster

Upper Smerral Wind Cluster is a cancelled wind power plant in Highland, Scotland, United Kingdom, with 2.7 MW of capacity, operated by Caithness Power.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand 690M SE Of Newlands Of Houstry DunbeathDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date19 Sept 2013 (reference 13/03555/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 May 2014 (refused, reference 13/03555/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorCaithness Power (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (0.9 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.2899, -3.4250DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Highland, reference 13/03555/FUL)
  2. Permit applied for (planning authority Highland, reference 13/03555/FUL)

How it compares

Upper Smerral Wind Cluster is the 1,022nd-largest of 1,340 power plants in Scotland and the 4,502nd-largest of 5,834 in the United Kingdom by capacity; its 2.7 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland1,022nd of 1,34046,467 MW<0.1%
United Kingdom4,502nd of 5,834200,500 MW<0.1%
All power plants in our data13,511th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 44 grid connections (18 operating, 267 MW) and 17 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Boulfruich Windfarm grid connectionGrid connection14.3 MWOperating1.1 km
Dunbeath GSPSubstation——2.8 km
Latheron PrimarySubstation——3.4 km
Tacher Wind grid connectionGrid connection12.9 MWOperating8.4 km
Burn of Whilk Wind Generating Station grid connectionGrid connection21.4 MWOperating13 km
Mybster 1 GSPSubstation——17 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom