Power plant · Argyll and Bute, Scotland, United Kingdom
Tangy 4 Wind Farm
Tangy 4 Wind Farm is a permitted power plant in Argyll and Bute, Scotland, United Kingdom, with 80 MW of capacity, operated by Scottish and Southern.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Argyll and Bute (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Tangy, Kilkenzie, Campbeltown, Argyll And Bute, PA28 6QD | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 20 Dec 2019 (permit ECU00000673, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 6 Sept 2018 (reference ECU00000673, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 20 Dec 2019 (granted, reference ECU00000673, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Scottish and Southern (Scottish & Southern (SSE)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 80 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 16 units | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.4967, -5.6644 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Scottish Government (S36), reference ECU00000673)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00000673)
How it compares
Tangy 4 Wind Farm is the 200th-largest of 872 power plants planned, permitted or under construction in Scotland and the 587th-largest of 3,222 in the United Kingdom by capacity; its 80 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 200th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 587th of 3,222 | 300,461 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,523rd of 6,455 | 664,040 MW | <0.1% |
Nearby
Within 50 km of this power plant: 23 grid connections (12 operating, 105 MW) and 16 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Tangy Windfarm grid connection | Grid connection | 12.1 MW | Operating | 2.9 km |
| Finlarig Power Station grid connection | Grid connection | 1.14 MW | Operating | 8.1 km |
| Lussa Power Station grid connection | Grid connection | 1.14 MW | Operating | 8.1 km |
| Campbeltown Primary | Substation | — | — | 8.4 km |
| Dippen Primary | Substation | — | — | 14 km |
| Carradale 1 GSP | Substation | — | — | 15 km |
Operator and place
More from Scottish and Southern
- Cloiche Wind Farm125 MW · permitted
- Tangy Wind Farm/Tangy 112.8 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.