Power plant · Aberdeenshire, Scotland, United Kingdom

South of Greenwellheads

South of Greenwellheads is a cancelled power plant in Aberdeenshire, Scotland, United Kingdom, with 5 MW of capacity, operated by Greenside Wind Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationAberdeenshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand To The S/Of Greenwellhead, St. Fergus, Peterhead, Grampian, AB42 3HGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date30 Oct 2015 (permit APP/2015/2949, Town and Country Planning Act, issued by Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Sept 2015 (reference APP/2015/2949, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date30 Oct 2015 (granted, reference APP/2015/2949, planning authority Aberdeenshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGreenside Wind EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area10.6 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.5827, -1.8918DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Aberdeenshire, reference APP/2015/2949)
  2. Permit applied for (planning authority Aberdeenshire, reference APP/2015/2949)

How it compares

South of Greenwellheads is the 755th-largest of 1,196 power plants in Scotland and the 2,742nd-largest of 5,050 in the United Kingdom by capacity; its 5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland755th of 1,19634,589 MW<0.1%
United Kingdom2,742nd of 5,050115,622 MW<0.1%
All power plants in our data8,380th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 92 grid connections (46 operating, 250 MW) and 45 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Wind 8.74 MW grid connection at St Fergus Gas TermGrid connection8.74 MWOperating1.1 km
5MW Greenside Wind Farm grid connectionGrid connection5 MWPlanned1.2 km
9MW WIND grid connectionGrid connection9 MWPlanned1.2 km
St Fergus GSPSubstation——2.4 km
Mintlaw PrimarySubstation——8.3 km
Peterhead Grange GSPSubstation——9.7 km

Operator and place

More from Greenside Wind Energy

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page