Sheirdrim Renewable Energy Development - Battery

Sheirdrim Renewable Energy Development - Battery is a cancelled power plant in Argyll and Bute, Scotland, United Kingdom, with 38 MW of capacity, operated by ScottishPower Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationArgyll and Bute (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSheirdrim Windfarm East Of, Clachan, Tarbert, Strathclyde, PA29 6DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Oct 2019 (reference ECU00001957, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date26 Jun 2023 (appeal refused, reference ECU00001957, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorScottishPower RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity38 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.7648, -5.4830DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Scottish Government (S36), reference ECU00001957)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00001957)

How it compares

Sheirdrim Renewable Energy Development - Battery is the 246th-largest of 1,196 power plants in Scotland and the 613th-largest of 5,050 in the United Kingdom by capacity; its 38 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland246th of 1,19634,589 MW0.11%
United Kingdom613th of 5,050115,622 MW<0.1%
All power plants in our data2,387th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 33 substations and 32 grid connections (16 operating, 157 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Claonaig PrimarySubstation——5.5 km
Tarbert, Loch Fyne PrimarySubstation——11 km
Deucheran Hill Windfarm grid connectionGrid connection14.2 MWOperating13 km
Ballure PrimarySubstation——13 km
Narachan Wind Farm grid connectionGrid connection72.6 MWPlanned14 km
Auchnasavil Farm grid connectionGrid connection49.9 MWPlanned17 km

Operator and place