Power plant · Highland, Scotland, United Kingdom

Rumster Forest Community Wind Farm

Rumster Forest Community Wind Farm is a cancelled power plant in Highland, Scotland, United Kingdom, with 2.7 MW of capacity, operated by Latheron, Lybster & Clyth Community Development Company.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressGaultiquoy, Rumster Forest, Lybster, Highlands, KW3DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date7 Aug 2015 (permit 11/04522/FUL, Town and Country Planning Act, issued by Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Dec 2011 (reference 11/04522/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date7 Aug 2015 (granted, reference 11/04522/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLatheron, Lybster & Clyth Community Development CompanyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity2.7 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units3 units (0.9 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.3495, -3.3533DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Highland, reference 11/04522/FUL)
  2. Permit applied for (planning authority Highland, reference 11/04522/FUL)

How it compares

Rumster Forest Community Wind Farm is the 906th-largest of 1,196 power plants in Scotland and the 3,877th-largest of 5,050 in the United Kingdom by capacity; its 2.7 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland906th of 1,19634,589 MW<0.1%
United Kingdom3,877th of 5,050115,622 MW<0.1%
All power plants in our data9,903rd of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 44 grid connections (18 operating, 267 MW) and 16 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Tacher Wind grid connectionGrid connection12.9 MWOperating3.4 km
Latheron PrimarySubstation——7.3 km
Boulfruich Windfarm grid connectionGrid connection14.3 MWOperating8.5 km
Burn of Whilk Wind Generating Station grid connectionGrid connection21.4 MWOperating8.9 km
Dunbeath GSPSubstation——10 km
Mybster 1 GSPSubstation——12 km

Operator and place

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom