Power plant · Highland, Scotland, United Kingdom
Lythmore House, Technology Park Forss - Battery Energy Storage
Lythmore House, Technology Park Forss - Battery Energy Storage is a permitted battery storage plant in Highland, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Forss Energy Storage Limited.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Highland (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 190m W/O Lythmore House, South Wing 21 Forss Business & Technology Park Forss, Forss, Thurso, KW14 7UZ | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 13 Aug 2025 (permit 24/04585/FUL, Town and Country Planning Act, issued by Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 13 Nov 2024 (reference 24/04585/FUL, planning authority Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 13 Aug 2025 (granted, reference 24/04585/FUL, planning authority Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Forss Energy Storage Limited (applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (stand-alone storage) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 58.6072, -3.6828 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Highland, reference 24/04585/FUL)
- Permit applied for (planning authority Highland, reference 24/04585/FUL)
How it compares
Lythmore House, Technology Park Forss - Battery Energy Storage is the 299th-largest of 742 power plants planned, permitted or under construction in Scotland and the 800th-largest of 2,548 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 299th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 800th of 2,548 | 279,068 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,897th of 5,799 | 657,076 MW | <0.1% |
Nearby
Within 50 km of this power plant: 50 grid connections (22 operating, 290 MW) and 20 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Wind 2.35 MW grid connection at Dounreay | Grid connection | 2.35 MW | Operating | 0.2 km |
| Crosskirk Energy Storage grid connection | Grid connection | 50 MW | Planned | 0.2 km |
| Forss Business Park grid connection | Grid connection | 50 MW | Planned | 0.2 km |
| Forss Primary | Substation | — | — | 0.9 km |
| Dounreay GSP | Substation | — | — | 5.4 km |
| Ormlie Primary | Substation | — | — | 8.8 km |
Operator and place
Grid connections attached to this power plant
Other power plants in Scotland
- Longannet2,260 MW
- Torness1,200 MW
- Peterhead1,180 MW
- Seagreen1,075 MW
- Hunterston B985 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.
- Wikidata. Wikidata, CC0 1.0.