Power plant · Dumfries and Galloway, Scotland, United Kingdom

Little Drum Solar Farm - Solar Park & Battery Storage

Little Drum Solar Farm - Solar Park & Battery Storage is a permitted battery storage plant in Dumfries and Galloway, Scotland, United Kingdom, with 12 MW of capacity, operated by Grupotec Solar UK 5 Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDumfries and Galloway (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLittle Drum Near High Banks, DG6 4QBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date28 Jul 2025 (permit 24/2616/FUL, Town and Country Planning Act, issued by Dumfries and Galloway)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Jan 2025 (reference 24/2616/FUL, planning authority Dumfries and Galloway)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date28 Jul 2025 (granted, reference 24/2616/FUL, planning authority Dumfries and Galloway)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGrupotec Solar UK 5 Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity12 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates54.8180, -4.0261DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Dumfries and Galloway, reference 24/2616/FUL)
  2. Permit applied for (planning authority Dumfries and Galloway, reference 24/2616/FUL)

How it compares

Little Drum Solar Farm - Solar Park & Battery Storage is the 589th-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,822nd-largest of 2,548 in the United Kingdom by capacity; its 12 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland589th of 74293,216 MW<0.1%
United Kingdom1,822nd of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data4,598th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 43 grid connections (28 operating, 388 MW) and 15 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Robin Rigg East Windfarm grid connectionGrid connection94.1 MWOperating25 km
Robin Rigg West Windfarm grid connectionGrid connection94.1 MWOperating25 km
Wythegill Wind Farm grid connectionGrid connection2.3 MWOperating35 km
SiddickSubstation——35 km
MaryportSubstation——36 km
Annie PitSubstation——37 km

Operator and place

More from Grupotec Solar UK 5 Limited

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom