Power plant · Highland, Scotland, United Kingdom

Lethen Wind Farm Wind Turbines and Energy Storage

Lethen Wind Farm Wind Turbines and Energy Storage is a cancelled power plant in Highland, Scotland, United Kingdom, with 10 MW of capacity, operated by Fred Olsen Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand 4700M NW Of Gamekeepers Cottage Nairn, IV12DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date21 Jan 2022 (reference ECU00002216, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date23 Feb 2024 (refused, reference ECU00002216, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorFred Olsen RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity10 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates57.4013, -3.7764DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Scottish Government (S36), reference ECU00002216)
  2. Permit applied for (planning authority Scottish Government (S36), reference ECU00002216)

How it compares

Lethen Wind Farm Wind Turbines and Energy Storage is the 605th-largest of 1,196 power plants in Scotland and the 1,838th-largest of 5,050 in the United Kingdom by capacity; its 10 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland605th of 1,19634,589 MW<0.1%
United Kingdom1,838th of 5,050115,622 MW<0.1%
All power plants in our data7,081st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 61 substations and 48 grid connections (19 operating, 471 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
TOM NAN Clach Farm Wind grid connectionGrid connection37.1 MWOperating5.2 km
Cairn Duhie Wind Farm grid connectionGrid connection104 MWPlanned11 km
Berry Burn Extension Wind Farm grid connectionGrid connection19.4 MWPlanned13 km
Grantown PrimarySubstation——14 km
Lethen PrimarySubstation——15 km
Tomatin PrimarySubstation——15 km