Power plant · South Ayrshire, Scotland, United Kingdom

Ladywell Avenue - Wind Turbine

Ladywell Avenue - Wind Turbine is a planned wind power plant in South Ayrshire, Scotland, United Kingdom, with 1 MW of capacity, operated by Land Energy Girvan Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Ayrshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address19 Ladywell Avenue, Girvan, KA26 9PFDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date24 Dec 2023 (reference 23/00816/APP, planning authority South Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLand Energy Girvan Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity1 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units1 units (1 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.2643, -4.8339DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority South Ayrshire, reference 23/00816/APP)

How it compares

Ladywell Avenue - Wind Turbine is the 730th-largest of 742 power plants planned, permitted or under construction in Scotland and the 2,457th-largest of 2,548 in the United Kingdom by capacity; its 1 MW is <0.1% of the 279,068 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland730th of 74293,216 MW<0.1%
United Kingdom2,457th of 2,548279,068 MW<0.1%
All power plants planned, permitted or under construction in our data5,708th of 5,799657,076 MW<0.1%

Nearby

Within 50 km of this power plant: 3 substations and 1 grid connection, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Whiting Bay PrimarySubstation——30 km
Glenkiln Farm grid connectionGrid connection4 MWPlanned35 km
Brodick PrimarySubstation——39 km
Machrie PrimarySubstation——45 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom