Power plant · East Ayrshire, Scotland, United Kingdom
Knockkippen Wind, Solar & Battery Farm
Knockkippen Wind, Solar & Battery Farm is a permitted power plant in East Ayrshire, Scotland, United Kingdom, with 16 MW of capacity, operated by Falck Renewables and REG Windpower.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | East Ayrshire (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Knockkippen Moss, KA6 7JH | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 30 Apr 2025 (permit ECU00004523, Electricity Act 1989 section 36, issued by Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 24 Jun 2022 (reference ECU00004523, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 30 Apr 2025 (granted, reference ECU00004523, planning authority Scottish Government (S36)) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Falck Renewables (Falck Renewables / REG Windpower, applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | REG Windpower (Falck Renewables / REG Windpower, applicant) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 16 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery (co-located with re) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 55.3493, -4.4648 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchLatest events
Dated events about this power plant from official notices and registers, newest first. All recent changes.
- Permit granted (planning authority Scottish Government (S36), reference ECU00004523)
- Permit applied for (planning authority Scottish Government (S36), reference ECU00004523)
How it compares
Knockkippen Wind, Solar & Battery Farm is the 568th-largest of 742 power plants planned, permitted or under construction in Scotland and the 1,726th-largest of 2,549 in the United Kingdom by capacity; its 16 MW is <0.1% of the 279,978 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 568th of 742 | 93,216 MW | <0.1% |
| United Kingdom | 1,726th of 2,549 | 279,978 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 4,025th of 5,782 | 643,557 MW | <0.1% |
Nearby
Within 50 km of this power plant: 2 substations and 1 grid connection, measured from the coordinates in the facts above.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Whiting Bay Primary | Substation | — | — | 43 km |
| Glenkiln Farm grid connection | Grid connection | 4 MW | Planned | 47 km |
| Brodick Primary | Substation | — | — | 49 km |
Operators and place
More from Falck Renewables
- Knockkippen Wind, Solar & Battery Farm60 MW · permitted
- Ben Aketil Wind Farm - Repowered & Extended59.4 MW · planned
- Millennium East49.6 MW · planned
- Moorhouse (Eaglesham)47.5 MW
- Clach Liath Wind Farm42.5 MW
- Earlsburn37.5 MW
- Auchrobert Wind Farm36 MW
- Earlsburn Avenue - Earlsburn Wind Farm Extension34 MW · permitted
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Auchentiber Road - Battery Energy Storage System700 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Braston New Energy500 MW
- Gretna Green Battery Storage456 MW
Data on this page
- Contains public sector information licensed under the Open Government Licence v3.0. DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Contains public sector information licensed under the Open Government Licence v3.0. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.