Power plant · Highland, Scotland, United Kingdom
Grigorhill Cottage, Grigorhill - Battery Energy Storage
Grigorhill Cottage, Grigorhill - Battery Energy Storage is a permitted power plant in Highland, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Opde UK Limted.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Highland (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | 330m E/O Grigorhill Cottage, Grigorhill, Nairn, IV12 5RL | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Permitted (planning permission granted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Permit date | 13 Jan 2026 (permit 25/00154/FUL, Town and Country Planning Act, issued by Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 10 Feb 2025 (ref. 25/00154/FUL, Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Decision date | 13 Jan 2026 (granted, ref. 25/00154/FUL, Highland) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Opde UK Limted | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 49.9 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Battery | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 57.5698, -3.8217 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Know more about this power plant, or want an introduction to its operator? Ask us.
How it compares
Grigorhill Cottage, Grigorhill - Battery Energy Storage is the 320th-largest of 872 power plants planned, permitted or under construction in Scotland and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 320th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 886th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 1,966th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 65 substations and 48 grid connections (19 operating, 526 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Newton of Park BESS 2 grid connection | Grid connection | 52.7 MW | Planned | 0.2 km |
| Blackpark Farm grid connection | Grid connection | 50 MW | Planned | 0.6 km |
| Nairn BESS grid connection | Grid connection | 29.4 MW | Planned | 0.6 km |
| Nairn GSP | Substation | — | — | 1.8 km |
| Nairn Central Primary | Substation | — | — | 3.0 km |
| Lethen Primary | Substation | — | — | 4.1 km |
Operator and place
Grid connections attached to this power plant
More from Opde UK Limted
- Bridgend Farm, Arbuthnott - Battery Energy Storage System49.9 MW · permitted
- Loanhead Farm - Battery Energy Storage System49.9 MW · planned
- Buckies Farm - Battery Energy Storage49.9 MW · planned
- Bindwells Battery Storage Facility49.9 MW · permitted
- Whitestones Birks Farm, Longmanhill - BESS49.9 MW
- Hall Road, Alderford - Solar Panels28 MW
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- Rare Context entity resolution. Rare Context entity resolution, CC0 1.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.