Greentoft, Neven Point, Eday - Wind Turbines & BESS is a planned power plant in Orkney Islands, Scotland, United Kingdom, with 24 MW of capacity, operated by Green Power.
Facts
Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.
| Fact | Value | Source |
|---|---|---|
| Location | Orkney Islands (coordinates), Scotland | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Address | Greentoft, Neven Point, Eday, Orkney, KW17 2AB | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Status | Planned (planning application submitted) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Onshore or offshore | Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Application date | 23 Jun 2025 (reference 25/203/TPPMAJ, planning authority Orkney Islands) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Operator | Green Power (Green Power (International) Limited) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Capacity | 24 MW | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Units | 5 units (4.8 MW per unit) | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Technology | Wind Onshore | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
| Coordinates | 59.2155, -2.7533 | DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026 |
Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.
Request researchHow it compares
Greentoft, Neven Point, Eday - Wind Turbines & BESS is the 559th-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,800th-largest of 3,222 in the United Kingdom by capacity; its 24 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.
| Within | Rank | Total | Share |
|---|---|---|---|
| Scotland | 559th of 872 | 99,272 MW | <0.1% |
| United Kingdom | 1,800th of 3,222 | 300,661 MW | <0.1% |
| All power plants planned, permitted or under construction in our data | 3,456th of 6,455 | 664,240 MW | <0.1% |
Nearby
Within 50 km of this power plant: 30 grid connections (16 operating, 63.1 MW) and 14 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.
| Name | Kind | Size | Status | Distance |
|---|---|---|---|---|
| Eday Primary | Substation | — | — | 3.4 km |
| Sanday Primary | Substation | — | — | 4.2 km |
| 4.8MW TIDAL grid connection | Grid connection | 4.8 MW | Planned | 6.0 km |
| Emec Tidal Test Facility grid connection | Grid connection | 22.5 MW | Planned | 6.0 km |
| Emec Tidal Test Facility grid connection | Grid connection | 30 MW | Planned | 6.0 km |
| Eday Tidal Primary | Substation | — | — | 6.2 km |
Operator and place
More from Green Power
- Carraig Gheal46 MW
- Broadmeadows36 MW
- Drumduff Wind Farm Extension15 MW · permitted
- Greentoft, Neven Point, Eday - Wind Turbines & BESS10 MW · planned
- Hayford Farm - extension8.2 MW
- Inverfarigaig4 MW
- Fordoun Sawmill Solar Array1.5 MW · permitted
Other power plants in Scotland
- Seagreen1,075 MW
- Moray East950 MW
- Moray West Offshore Wind Farm Project882 MW
- Lewis Wind Farm (Barvas Moor)652 MW
- Beatrice588 MW
- Neart na Gaoithe450 MW
- Viking Wind Farm443 MW
- Cruachan440 MW
Data on this page
- DESNZ Renewable Energy Planning Database (REPD). DESNZ Renewable Energy Planning Database (REPD), Open Government Licence v3.0.
- Source: U.S. Energy Information Administration (Sep 2026). EIA-860 / 860M / 923, Public domain.
- Bundesnetzagentur, Marktstammdatenregister. Marktstammdatenregister, DL-DE-BY-2.0.
- Planning Inspectorate: National Infrastructure Projects. Planning Inspectorate: National Infrastructure Projects, Open Government Licence v3.0.
- RVO SDE(+)(+) projecten in beheer and SDE viewer. RVO SDE(+)(+) projecten in beheer and SDE viewer, Free reuse, no attribution required.
- SSEN Distribution. SSEN Distribution data portal, CC BY 4.0.