Power plant · Perth and Kinross, Scotland, United Kingdom

Green Burn Wind Farm

Green Burn Wind Farm is a cancelled power plant in Perth and Kinross, Scotland, United Kingdom, with 33 MW of capacity, operated by ABO Wind.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Addressland at Blackhall Farm and Shieldrum Farm, approximately 11km north-west of Alyth and 5km north-east of Bridge of Cally in Perth and KinrossDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date20 Feb 2018 (permit 15/01691/FLM, Town and Country Planning Act, issued by Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date7 Oct 2015 (reference 15/01691/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Feb 2018 (granted, reference 15/01691/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date15 Mar 2017 (refused, reference 15/01691/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date20 Feb 2018 (appeal granted, reference 15/01691/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorABO WindDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity33 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units11 units (3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.6864, -3.3721DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Perth and Kinross, reference 15/01691/FLM)
  2. Permit granted (appeal granted, planning authority Perth and Kinross, reference 15/01691/FLM)
  3. Permit refused (planning authority Perth and Kinross, reference 15/01691/FLM)
  4. Permit applied for (planning authority Perth and Kinross, reference 15/01691/FLM)

How it compares

Green Burn Wind Farm is the 284th-largest of 1,196 power plants in Scotland and the 687th-largest of 5,050 in the United Kingdom by capacity; its 33 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland284th of 1,19634,589 MW<0.1%
United Kingdom687th of 5,050115,622 MW<0.1%
All power plants in our data2,641st of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 96 grid connections (31 operating, 431 MW) and 71 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Green Burn Wind Farm grid connectionGrid connection49.8 MWPlanned2.0 km
Dalrulzion PrimarySubstation——3.5 km
Wind 8.74 MW grid connection at Coupar Angus GridGrid connection8.74 MWOperating8.1 km
Alyth PrimarySubstation——11 km
99.56MW PV/BESS grid connectionGrid connection99.6 MWPlanned11 km
Blairgowrie PrimarySubstation——12 km

Operator and place

More from ABO Wind

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page