Power plant · Highland, Scotland, United Kingdom

Forss Extension (Forss III) Wind Farm

Forss Extension (Forss III) Wind Farm is a cancelled wind power plant in Highland, Scotland, United Kingdom, with 6.5 MW of capacity, operated by Renewable Energy Systems.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThurso, CaithnessDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Oct 2010 (reference 10/04434/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Oct 2011 (refused, reference 10/04434/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jul 2012 (appeal refused, reference 10/04434/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable Energy Systems (Renewable Energy Systems (RES), applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity6.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (1.3 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.6062, -3.6823DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Highland, reference 10/04434/FUL)
  2. Permit refused (planning authority Highland, reference 10/04434/FUL)
  3. Permit applied for (planning authority Highland, reference 10/04434/FUL)

How it compares

Forss Extension (Forss III) is the 817th-largest of 1,340 power plants in Scotland and the 3,006th-largest of 5,834 in the United Kingdom by capacity; its 6.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland817th of 1,34046,467 MW<0.1%
United Kingdom3,006th of 5,834200,500 MW<0.1%
All power plants in our data11,518th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 50 grid connections (22 operating, 290 MW) and 20 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Wind 2.35 MW grid connection at DounreayGrid connection2.35 MWOperating0.1 km
Crosskirk Energy Storage grid connectionGrid connection50 MWPlanned0.1 km
Forss Business Park grid connectionGrid connection50 MWPlanned0.1 km
Forss PrimarySubstation——0.8 km
Dounreay GSPSubstation——5.3 km
Ormlie PrimarySubstation——8.7 km