Power plant · Highland, Scotland, United Kingdom

Dounreay Windfarm

Dounreay Windfarm is a cancelled power plant in Highland, Scotland, United Kingdom, with 17.5 MW of capacity, operated by Scottish Power Renewables.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressAdjacent to Dounreay Nuclear Power Development Establishment, Borrowston Mains, Forss, Thurso, CaithnessDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date25 Apr 2002 (reference 02/00166/FULCA, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date4 Mar 2005 (appeal refused, reference 02/00166/FULCA, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Sept 2003 (refused, reference 02/00166/FULCA, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorScottish Power RenewablesDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity17.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units10 unitsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.5757, -3.7401DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority Highland, reference 02/00166/FULCA)
  2. Permit refused (planning authority Highland, reference 02/00166/FULCA)
  3. Permit applied for (planning authority Highland, reference 02/00166/FULCA)

How it compares

Dounreay Windfarm is the 496th-largest of 1,196 power plants in Scotland and the 1,293rd-largest of 5,050 in the United Kingdom by capacity; its 17.5 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland496th of 1,19634,589 MW<0.1%
United Kingdom1,293rd of 5,050115,622 MW<0.1%
All power plants in our data4,515th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 49 grid connections (22 operating, 290 MW) and 19 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Dounreay GSPSubstation——0.8 km
Dounreay BESS grid connectionGrid connection36 MWPlanned1.7 km
Forss 2 Windfarm HV grid connectionGrid connection5.26 MWOperating4.0 km
Forss PrimarySubstation——4.5 km
Crosskirk Energy Storage grid connectionGrid connection50 MWPlanned4.7 km
Melvich PrimarySubstation——11 km

Operator and place

More from Scottish Power Renewables

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom