Power plant · Perth and Kinross, Scotland, United Kingdom

Coupar Angus, Pleasance Road - Battery Energy Facility

Coupar Angus, Pleasance Road - Battery Energy Facility is a permitted power plant in Perth and Kinross, Scotland, United Kingdom, with 49.9 MW of capacity, operated by Gresham House Asset Management Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPerth and Kinross (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Address130 Metres South East Of Coupar Angus Substation Pleasance Road, PH13 9LZDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date11 Sept 2024 (permit 24/00200/FLM, Town and Country Planning Act, issued by Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date13 Mar 2024 (reference 24/00200/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date11 Sept 2024 (granted, reference 24/00200/FLM, planning authority Perth and Kinross)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorGresham House Asset Management LimitedDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity49.9 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (stand-alone storage)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.5437, -3.2704DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Perth and Kinross, reference 24/00200/FLM)
  2. Permit applied for (planning authority Perth and Kinross, reference 24/00200/FLM)

How it compares

Coupar Angus, Pleasance Road - Battery Energy Facility is the 320th-largest of 872 power plants planned, permitted or under construction in Scotland and the 886th-largest of 3,222 in the United Kingdom by capacity; its 49.9 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland320th of 87299,272 MW<0.1%
United Kingdom886th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data1,966th of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 102 grid connections (32 operating, 439 MW) and 73 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Abroath BESS (MSID 8771) EXP grid connectionGrid connection33.3 MWOperating0.4 km
Coupar Angus Battery Stor grid connectionGrid connection38 MWOperating0.4 km
Coupar Angus GSPSubstation——0.6 km
Coupar Angus PrimarySubstation——0.6 km
Balgersho PV grid connectionGrid connection9.9 MWPlanned2.0 km
Blairgowrie PrimarySubstation——5.7 km

Operator and place