Power plant · Highland, Scotland, United Kingdom

Corpach Biomass Energy Plant

Corpach Biomass Energy Plant is a cancelled power plant in Highland, Scotland, United Kingdom, with 20 MW of capacity, operated by Peel Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressKilmallie Hall Corpach Fort William, PH33 7JHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (abandoned)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date9 Dec 2010 (permit 10/04344/FUL, Town and Country Planning Act, issued by Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date27 Oct 2010 (ref. 10/04344/FUL, Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date9 Dec 2010 (granted, ref. 10/04344/FUL, Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorPeel EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBiomass (dedicated)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates56.8444, -5.1201DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Know more about this power plant, or want an introduction to its operator? Ask us.

How it compares

Corpach Biomass Energy Plant is the 433rd-largest of 1,196 power plants in Scotland and the 1,079th-largest of 5,050 in the United Kingdom by capacity; its 20 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland433rd of 1,19634,589 MW<0.1%
United Kingdom1,079th of 5,050115,642 MW<0.1%
All power plants in our data3,907th of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 37 substations and 36 grid connections (29 operating, 239 MW), measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Annat PrimarySubstation——1.4 km
Inverlochy PrimarySubstation——2.6 km
Lochaber Smelter grid connectionGrid connection2.71 MWOperating3.3 km
Pinegrove PrimarySubstation——3.4 km
Hydro 1.1 MW grid connection at InverlochyGrid connection1.1 MWOperating6.5 km
Garvan Hydro grid connectionGrid connection2 MWOperating10 km