Power plant · Highland, Scotland, United Kingdom

Caplich Wind Farm

Caplich Wind Farm is a cancelled power plant in Highland, Scotland, United Kingdom, with 68 MW of capacity, operated by Muirhall Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand 450M NW Of Beinn An Eoin Bheag Caplich LairgDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date10 Jan 2015 (reference EC00002088, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Apr 2018 (refused, reference EC00002088, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Apr 2018 (appeal refused, reference EC00002088, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMuirhall EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity68 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units23 units (3.4 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.0151, -4.7581DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Caplich Wind Farm is the 94th-largest of 1,196 power plants in Scotland and the 230th-largest of 5,050 in the United Kingdom by capacity; its 68 MW is <0.1% of the 115,642 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland94th of 1,19634,589 MW0.2%
United Kingdom230th of 5,050115,642 MW<0.1%
All power plants in our data1,462nd of 12,0081,173,302 MW<0.1%

Nearby

Within 50 km of this power plant: 40 grid connections (24 operating, 278 MW) and 27 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Strath Oykel Wind Farm 77.6MW grid connectionGrid connection77.6 MWPlanned6.8 km
Glenrossal Energy Park grid connectionGrid connection94.4 MWPlanned6.9 km
Achany Wind Farm grid connectionGrid connection49.9 MWOperating12 km
Cassley GSPSubstation——19 km
Overscaig PrimarySubstation——19 km
Drumrunie PrimarySubstation——20 km

Operator and place

More from Muirhall Energy

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page