Power plant · Dumfries and Galloway, Scotland, United Kingdom

Callisterhall Wind Farm - Wind Farm & Battery Storage

Callisterhall Wind Farm - Wind Farm & Battery Storage is a cancelled wind power plant in Dumfries and Galloway, Scotland, United Kingdom, with 39.2 MW of capacity, operated by Epower Limited.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDumfries and Galloway (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressCallisterhall Wind Farm, Langholm, DG13 9ATDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date1 Jul 2022 (reference 22/0930/FUL, planning authority Dumfries and Galloway)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Dec 2022 (refused, reference 22/0930/FUL, planning authority Dumfries and Galloway)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorEpower Limited (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity39.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units7 units (5.6 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.1430, -3.1237DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Dumfries and Galloway, reference 22/0930/FUL)
  2. Permit applied for (planning authority Dumfries and Galloway, reference 22/0930/FUL)

How it compares

Callisterhall Wind Farm - Wind Farm & Battery Storage is the 299th-largest of 1,340 power plants in Scotland and the 927th-largest of 5,834 in the United Kingdom by capacity; its 39.2 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland299th of 1,34046,467 MW<0.1%
United Kingdom927th of 5,834200,500 MW<0.1%
All power plants in our data4,567th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 47 grid connections (23 operating, 164 MW), 23 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Beck Burn Wind Farm grid connectionGrid connection31.1 MWOperating16 km
EastonSubstation——19 km
Burnfoot Farm grid connectionGrid connection45 MWPlanned19 km
Hallburn Farm grid connectionGrid connection13.2 MWOperating20 km
Cross Border Connection (England)Transmission line—Planned22 km
WestlintonSubstation——22 km
Kinkry HillSubstation——24 km

Operator and place

More from Epower Limited

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page