Power plant · Highland, Scotland, United Kingdom

Buckies Hill Wind Farm

Buckies Hill Wind Farm is a cancelled wind power plant in Highland, Scotland, United Kingdom, with 4.5 MW of capacity, operated by HP Sleigh & Son Ltd.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationHighland (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressLand 790m South of Farm House, Buckies, Halkirk, KW14 7XHDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date6 Nov 2014 (reference 14/03913/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date24 Apr 2015 (refused, reference 14/03913/FUL, planning authority Highland)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorHP Sleigh & Son Ltd (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity4.5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units5 units (0.9 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates58.5428, -3.5272DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (planning authority Highland, reference 14/03913/FUL)
  2. Permit applied for (planning authority Highland, reference 14/03913/FUL)

How it compares

Buckies Hill Wind Farm is the 943rd-largest of 1,340 power plants in Scotland and the 3,981st-largest of 5,834 in the United Kingdom by capacity; its 4.5 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland943rd of 1,34046,467 MW<0.1%
United Kingdom3,981st of 5,834200,500 MW<0.1%
All power plants in our data12,680th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 50 grid connections (22 operating, 290 MW) and 21 substations, measured from the coordinates in the facts above. The table shows the nearest 6, up to 3 per kind.

NameKindSizeStatusDistance
Buckies Farm grid connectionGrid connection52.7 MWPlanned2.3 km
Geise Battery Storage grid connectionGrid connection50 MWPlanned2.4 km
Upper Geislittle / Weydale grid connectionGrid connection3.33 MWOperating3.2 km
Thurso South GSPSubstation——3.6 km
Ormlie PrimarySubstation——4.8 km
Halkirk PrimarySubstation——4.9 km

Operator and place

Other power plants in Scotland

All 2105 power plants in Scotland, United Kingdom

Data on this page