Power plant · South Ayrshire, Scotland, United Kingdom

Breaker Hill

Breaker Hill is a cancelled power plant in South Ayrshire, Scotland, United Kingdom, with 7.2 MW of capacity, operated by Wind Prospect Developments.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationSouth Ayrshire (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressThe site is located 8km South of Girvan between Pinwherry and ColmonellDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (appeal refused)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Onshore or offshoreOnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date28 Nov 2013 (reference 13/01310/APP, planning authority South Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date2 Feb 2015 (appeal refused, reference 13/01310/APP, planning authority South Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Jun 2014 (refused, reference 13/01310/APP, planning authority South Ayrshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorWind Prospect DevelopmentsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity7.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Units9 units (0.8 MW per unit)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyWind OnshoreDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.1620, -4.8639DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit refused (appeal refused, planning authority South Ayrshire, reference 13/01310/APP)
  2. Permit refused (planning authority South Ayrshire, reference 13/01310/APP)
  3. Permit applied for (planning authority South Ayrshire, reference 13/01310/APP)

How it compares

Breaker Hill is the 688th-largest of 1,196 power plants in Scotland and the 2,343rd-largest of 5,050 in the United Kingdom by capacity; its 7.2 MW is <0.1% of the 115,622 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
Scotland688th of 1,19634,589 MW<0.1%
United Kingdom2,343rd of 5,050115,622 MW<0.1%
All power plants in our data7,827th of 12,0321,190,447 MW<0.1%

Nearby

Within 50 km of this power plant: 2 substations and 1 grid connection, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Whiting Bay PrimarySubstation——40 km
Glenkiln Farm grid connectionGrid connection4 MWPlanned44 km
Brodick PrimarySubstation——49 km

Operator and place

More from Wind Prospect Developments

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page