Power plant · Dumfries and Galloway, Scotland, United Kingdom

Bloch Wind Farm & Battery Storage (Solway Bank Extension)

Bloch Wind Farm & Battery Storage (Solway Bank Extension) is a planned power plant in Dumfries and Galloway, Scotland, United Kingdom, with 45 MW of capacity, operated by Renewable Energy Systems.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationDumfries and Galloway (coordinates), ScotlandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressSolwaybank, Allfornought Hill, Langholm, DG13DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPlanned (planning application submitted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Nov 2022 (reference ECU00003463, planning authority Scottish Government (S36))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorRenewable Energy Systems (Renewable Energy Systems (RES))DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity45 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyBattery (co-located with re)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates55.1185, -3.0656DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit applied for (planning authority Scottish Government (S36), reference ECU00003463)

How it compares

Bloch Wind Farm & Battery Storage (Solway Bank Extension) is the 422nd-largest of 872 power plants planned, permitted or under construction in Scotland and the 1,289th-largest of 3,222 in the United Kingdom by capacity; its 45 MW is <0.1% of the 300,461 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
Scotland422nd of 87299,272 MW<0.1%
United Kingdom1,289th of 3,222300,461 MW<0.1%
All power plants planned, permitted or under construction in our data2,422nd of 6,455664,040 MW<0.1%

Nearby

Within 50 km of this power plant: 50 grid connections (23 operating, 164 MW), 24 substations and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Beck Burn Wind Farm grid connectionGrid connection31.1 MWOperating13 km
EastonSubstation——14 km
Burnfoot Farm grid connectionGrid connection45 MWPlanned15 km
Hallburn Farm grid connectionGrid connection13.2 MWOperating16 km
WestlintonSubstation——18 km
Cross Border Connection (England)Transmission line—Planned18 km
Kinkry HillSubstation——20 km

Operator and place

More from Renewable Energy Systems

Other power plants in Scotland

All 2093 power plants in Scotland, United Kingdom

Data on this page