Power plant · Torbay, England, United Kingdom

Torbay Hospital, Nightingale Park - Solar Panel Array

Torbay Hospital, Nightingale Park - Solar Panel Array is a cancelled solar power plant in Torbay, England, United Kingdom, with 3.2 MW of capacity, operated by TDA.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTorbay (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNightingale Park Barton Hill Way Torquay, TQ2 8JGDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date16 Jun 2022 (permit P/2021/1287, Town and Country Planning Act, issued by Torbay)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date26 Nov 2021 (reference P/2021/1287, planning authority Torbay)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date16 Jun 2022 (granted, reference P/2021/1287, planning authority Torbay)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorTDA (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity3.2 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area13.8 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates50.4881, -3.5467DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Torbay, reference P/2021/1287)
  2. Permit applied for (planning authority Torbay, reference P/2021/1287)

How it compares

Torbay Hospital, Nightingale Park - Solar Panel Array is the 2,973rd-largest of 4,035 power plants in England and the 4,326th-largest of 5,834 in the United Kingdom by capacity; its 3.2 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England2,973rd of 4,035134,434 MW<0.1%
United Kingdom4,326th of 5,834200,500 MW<0.1%
All power plants in our data13,218th of 15,8001,923,633 MW<0.1%

Nearby

Within 50 km of this power plant: 1 mine, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Tungsten WestMine——35 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom