Power plant · Shropshire, England, United Kingdom

Swancote Farm -Solar Panels

Swancote Farm -Solar Panels is a permitted power plant in Shropshire, England, United Kingdom, with 5 MW of capacity, operated by Swancote Energy.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationShropshire (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressNw/O Swancote Farm, Swancote, Bridgnorth, WV15 5HBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusPermitted (planning permission granted)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date21 Jan 2025 (permit 24/04003/FUL, Town and Country Planning Act, issued by Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date17 Oct 2024 (reference 24/04003/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date21 Jan 2025 (granted, reference 24/04003/FUL, planning authority Shropshire)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorSwancote EnergyDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity5 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area6.7 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates52.5439, -2.3784DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

How it compares

Swancote Farm -Solar Panels is the 1,613th-largest of 2,174 power plants planned, permitted or under construction in England and the 2,484th-largest of 3,222 in the United Kingdom by capacity; its 5 MW is <0.1% of the 300,661 MW of power plants planned, permitted or under construction we hold for the United Kingdom. It is not built yet, so it is ranked among the power plants planned, permitted or under construction in our data, apart from the ones running today. Ranks and totals cover the ones that report their capacity.

WithinRankTotalShare
England1,613th of 2,174186,088 MW<0.1%
United Kingdom2,484th of 3,222300,661 MW<0.1%
All power plants planned, permitted or under construction in our data5,616th of 6,455664,240 MW<0.1%

Nearby

Within 50 km of this power plant: 221 grid connections, 4 data centers and 1 transmission line, measured from the coordinates in the facts above. The table shows the nearest 7, up to 3 per kind.

NameKindSizeStatusDistance
Swancote Farm Generation grid connectionGrid connection——0.3 km
Stourbridge Road grid connectionGrid connection——2.5 km
Tidle Brook Solar and Storage grid connectionGrid connection——6.4 km
Hutchison 3GData center——24 km
EE Data CentreData center——24 km
Ionos data center, EnglandData center——40 km
Reinforcement to North Shropshire Electricity Distribution NetworkTransmission line—Permitted48 km

Operator and place