Power plant · Preston, England, United Kingdom

Red Scar Industrial Estate - EfW Power Station

Red Scar Industrial Estate - EfW Power Station is a cancelled power plant in Preston, England, United Kingdom, with 40 MW of capacity, operated by Miller Turner Group.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationPreston (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressRed Scar Industrial Estate, Longriddge Road, Preston, PR2 5LXDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date27 Nov 2019 (permit LCC/2019/0029, Town and Country Planning Act, issued by Preston)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date5 Jun 2019 (reference LCC/2019/0029, planning authority Preston)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date27 Nov 2019 (granted, reference LCC/2019/0029, planning authority Preston)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorMiller Turner Group (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity40 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologyEfW IncinerationDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates53.7826, -2.6367DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Preston, reference LCC/2019/0029)
  2. Permit applied for (planning authority Preston, reference LCC/2019/0029)

How it compares

Red Scar Industrial Estate - EfW is the 532nd-largest of 4,035 power plants in England and the 872nd-largest of 5,834 in the United Kingdom by capacity; its 40 MW is <0.1% of the 200,500 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England532nd of 4,035134,434 MW<0.1%
United Kingdom872nd of 5,834200,500 MW<0.1%
All power plants in our data4,455th of 15,7991,918,113 MW<0.1%

Nearby

Within 50 km of this power plant: 371 grid connections (201 operating, 1,725 MW), 348 substations, 11 data centers, 2 transmission lines and 1 gas storage facility, measured from the coordinates in the facts above. The table shows the nearest 9, up to 3 per kind.

NameKindSizeStatusDistance
Redscar Business Park grid connectionGrid connection42.1 MWOperating0.3 km
Red Scar Business Park grid connectionGrid connection49.9 MWPlanned0.3 km
Longridge Road Energy Centre grid connectionGrid connection50.5 MWPlanned0.6 km
RibbletonSubstation——1.3 km
Preston EastSubstation——1.6 km
Preston East BSPSubstation——1.6 km
East Irish Sea Transmission ProjectTransmission line—Planned13 km
Preesall Saltfield Underground Gas StorageGas storage facility—Cancelled26 km
Morgan and Morecambe Offshore Wind Farms Transmission AssetsTransmission line—Permitted27 km

Operator and place

Other power plants in England

All 5872 power plants in England, United Kingdom

Data on this page