Power plant · Tendring, England, United Kingdom

Primrose Hall Solar Farm

Primrose Hall Solar Farm is a cancelled solar power plant in Tendring, England, United Kingdom, with 20 MW of capacity, operated by Low Carbon.

Facts

Every value links to its source, and to the source's own record where it has one. Licences and last-checked dates are per row.

FactValueSource
LocationTendring (coordinates), EnglandDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
AddressS/O Primrose Hall, CO12 5NBDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
StatusCancelled (planning permission granted, permission expired)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Permit date19 Mar 2021 (permit 20/01384/FUL, Town and Country Planning Act, issued by Tendring)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Application date2 Oct 2020 (reference 20/01384/FUL, planning authority Tendring)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Decision date19 Mar 2021 (granted, reference 20/01384/FUL, planning authority Tendring)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
OperatorLow Carbon (applicant)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Capacity20 MWDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
TechnologySolar PhotovoltaicsDESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Area28.5 ha (solar site area)DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026
Coordinates51.9153, 1.1646DESNZ Renewable Energy Planning Database (REPD) · Open Government Licence v3.0 · checked 24 Oct 2026

Research on this power plant and its operator.Who owns it up to the parent company, its grid connection and planning status, and an introduction to the operator.

Request research

Latest events

Dated events about this power plant from official notices and registers, newest first. All recent changes.

  1. Permit granted (planning authority Tendring, reference 20/01384/FUL)
  2. Permit applied for (planning authority Tendring, reference 20/01384/FUL)

How it compares

Primrose Hall Solar Farm is the 878th-largest of 4,036 power plants in England and the 1,482nd-largest of 5,837 in the United Kingdom by capacity; its 20 MW is <0.1% of the 200,833 MW we hold for the United Kingdom. Ranks and totals cover the power plants in our data that report their capacity, not every one in existence. Power plants planned, permitted or under construction are ranked apart.

WithinRankTotalShare
England878th of 4,036134,406 MW<0.1%
United Kingdom1,482nd of 5,837200,833 MW<0.1%
All power plants in our data4,543rd of 13,0281,354,089 MW<0.1%

Nearby

Within 50 km of this power plant: 3 transmission lines, measured from the coordinates in the facts above.

NameKindSizeStatusDistance
Bramford to TwinsteadTransmission line—Permitted24 km
LionLink InterconnectorTransmission line—Planned40 km
Sea LinkTransmission line—Planned44 km

Operator and place

More from Low Carbon

Other power plants in England

All 5876 power plants in England, United Kingdom

Data on this page